Gigawatt-scale offshore wind
Hornsea One reaches 1.2 GW with 7 MW turbines 120 km offshore.
Hornsea One, completed in 2019-2020, was the first offshore wind farm over 1 GW. Turbines grew from 0.45 MW at Vindeby to over 15 MW prototypes by 2023, with rotors wider than 230 m.
What it built on 2
What it led to 1
Related measurements
The dashed line marks when it first worked.
Installed wind capacity Latest: 1.29k GW (2025) Source: Our World in Data
Wind electricity generation Latest: 2.71k TWh (2025) Source: Our World in Data
World electricity generation Latest: 31.8k TWh (2025) Source: Our World in Data