Energy · 1956
Gedser wind turbine
Juul's three-bladed, upwind, stall-regulated design becomes the Danish concept.
Johannes Juul's 200 kW Gedser turbine ran from 1957 to 1967 with three blades facing into the wind. After the 1970s oil shocks, Danish firms such as Vestas scaled this layout into the modern wind industry.
What it built on 1
What it led to 1
Related measurements
The dashed line marks when it first worked.
Installed wind capacity Latest: 1.29k GW (2025) Source: Our World in Data
Wind electricity generation Latest: 2.71k TWh (2025) Source: Our World in Data