Gedser wind turbine

Juul's three-bladed, upwind, stall-regulated design becomes the Danish concept.

Johannes Juul's 200 kW Gedser turbine ran from 1957 to 1967 with three blades facing into the wind. After the 1970s oil shocks, Danish firms such as Vestas scaled this layout into the modern wind industry.